Pre-Construction Services · Miami, FL
PRE-CONSTRUCTION SERVICES.
Where budget control
ACTUALLY STARTS.
Most projects lose cost control before construction begins. Undefined scope, uncoordinated drawings, and missing procurement timelines don’t surface on-site — they were already locked in during planning. We close that gap.
Why It Matters
Most overruns are decided
before ground is broken.
The decision to skip pre-construction doesn't feel like a decision — it feels like
moving faster. It isn't. Undefined scope, uncoordinated drawings, and absent procurement
planning don't stay hidden. They become RFIs, change orders, and schedule extensions once
construction is underway — when fixing them costs three to ten times more.
01
No BIM coordination
MEP conflicts discovered on-site. Average resolution:
2–4 weeks of lost schedule per conflict cluster.
02
No cost modeling
Budget set from gut or comp data. Actual trade pricing
arrives at GMP — 15–30% above assumptions is common.
03
No procurement strategy
Long-lead items ordered late. Mechanical, electrical,
and specialty items carry 8–22 week lead times in
Miami's current supply chain.
Pre-construction is not an added cost.
It is the mechanism that makes your budget defensible.
Our Plans
PRE-CONSTRUCTION SERVICES
Tier 1
Feasibility
$10,000
BIM & Technical Coordination
⌄
- BIM coordination & clash detection (architecture, structure, MEP)
- 4D sequencing (model + schedule)
- 5D BIM (model + cost integration)
- Consultant model review
Value Engineering
⌄
- Alternative material proposals
- Structural system optimization
- MEP cost reduction
- Prefabrication evaluation
Constructability Review
⌄
- Construction detail review
- Pre-construction conflict identification
- Efficient construction method recommendations
- Site access, staging & logistics evaluation
* Fee discounted from construction estimate if project is awarded.
Tier 2
Full Pre-Construction
$20,000
Everything in Tier 1
- BIM Coordination · Value Engineering · Constructability Review
Cost Estimation & Control
⌄
- Conceptual / ROM estimate
- Detailed quantity takeoffs
- Cost benchmarking
- Value engineering
- Trade package estimates
Planning & Scheduling
⌄
- Master schedule development
- Phasing plan
- Critical path analysis
- Procurement timeline analysis
* Fee discounted from construction estimate if project is awarded.
Planning a Construction or Renovation Project?
Before starting any renovation project, we provide a detailed scope review,
timeline projection, and cost estimate so you understand exactly what the
project requires before construction begins.
Schedule a Renovation Consultation